Hubbard, OR
The 91 School project started as a combination of interior and exterior upgrades as part of the Canby School Districts Bond projects. The 91 School was a two phased project that spanned over the summers of 2022 and 2023.
The first phase consisted of the replacement of the playground. Work included new concrete walks, stairs and pads, a drainage system, metal hand railing and chain link fencing. Work also included an interior vestibule created by a storefront system, as well as some preparatory infrastructure for phase two.
Phase two was the remodel of specific areas of the school which included the front office, vestibule and three restrooms. Roof patching, minor seismic work, flooring, painting, access control and complete lighting replacement were some of the improvements of the project. The entire exterior of the school was painted, and the parking area was reworked to provide a safer pick-up area for the students.
Project Details
OWNER
Canby School District
ARCHITECT
Mahlum Architects
BUDGET
$2,620,632
PROJECT TYPE
COMPLETED
Aug. 1, 2024














