Silverton, OR

Mark Twain Elementary School in Silverton, Oregon was a 1.7 million dollar hard bid seismic retrofit project that was initially over budget. Woodburn Construction worked together with ZCS Engineering and were able to reduce the cost by over $400,000.00 with some creative engineering and cost savings ideas. The project was initially designed to have below-ground pilings with columns at the perimeter of the building.

The redesign incorporated above ground concrete columns with a below grade concrete beam that tied the East and West sides of the building. Those elements, together with large wood beams on the interior of the building created a fully functional structural system at a much lower price. Concrete shear panels were installed at the North end of the building which added strength to existing wood beams that were seismically tied together with new hardware. Some minor interior remodeling was done during the seismic installation as well. The project was completed on time and well under budget.

Project Details

OWNER

Silver Falls School District

ARCHITECT

ZCS Engineering/Architecture

BUDGET

$1,460,000

PROJECT TYPE
COMPLETED

December 1, 2019

Project Gallery