Salem, OR
The State Library project was completed in 2020 and consisted mostly of renovations to the third floor. The building, originally completed in 1939, would ultimately become new offices for the Governor and her staff. Access was a challenge and so, a scaffold stairway was installed on the exterior of the building and a window removed to bypass the lower floors, provide access for construction workers and minimize disruption to the partially occupied building.
The third-floor interior was almost completely demolished to clear the way for the new alterations. Steel stud and drywall partitions created the new office spaces. A secure vestibule consisting of bullet proof glass and drywall was installed as part of the project. Oregon white oak panels, linear wood ceilings and travertine flooring were some of the special finishes that were selected. A new roof-top chiller was also installed along with new LED lighting throughout the building.
Project Details
OWNER
State of Oregon
ARCHITECT
FFA Architecture and Interiors, Inc.
BUDGET
$4,016,692
PROJECT TYPE
COMPLETED
Dec. 1, 2020